Construction project controls · Chicago

Wise decisions on current, validated data.

Pharus is an independent consultancy for mid-size general contractors and building owners. We connect cost, schedule, and risk to the decisions that keep a project on its commitments.

  • Independent of the contractor and the owner
  • Every metric tied to a decision
  • Based in Chicago, Illinois

The problem

Projects usually learn too late.

Construction work moves every day. The picture used to steer it often does not.

  1. 01

    Delays and overruns surface late

    Cost growth and slippage are often recognized only after a milestone is missed, or after the pay period that could have absorbed a correction is already closed.

  2. 02

    Decisions rest on stale or unvalidated data

    Schedules, cost reports, and field records are updated on different clocks, and they are not always checked against each other. People still have to choose.

  3. 03

    A report is not a decision

    A red cell with no owner, no threshold, and no required action is a notification. It does not tell the project who must act, or by when.

The solution

Control the decision, not only the report.

Pharus uses a Decision-Centered Construction Project Control Methodology. Material choices on the project are defined in advance as Decision Control Points.

Each point names the person who decides, the information they need, where it comes from, the baseline, the indicator, and the threshold that requires action.

When a threshold is crossed, the project does not wait for the next monthly narrative. It finds the cause, forecasts the effect, chooses a corrective action, and checks whether that action worked.

  1. Decision
  2. Responsible Actor
  3. Information needed
  4. Source
  5. Baseline
  6. Indicator
  7. Threshold
  8. Root Cause
  9. Forecast
  10. Corrective Action
  11. Verification
  12. Lesson Learned
See how a Decision Control Point is built

Who it is for

Oversight for the people who carry the risk.

General contractors

Catch deviations while you can still protect the job.

See cost and schedule movement early enough to protect margin and milestones. Walk into the next meeting with validated numbers and a recorded decision, not a stack of conflicting reports.

Owners and developers

An independent view, with the decisions written down.

Get visibility that does not depend on a single party’s narrative. See what the validated data supports, what was decided, and whether the action that followed closed the gap.